I took photos today of the closets. The baseboards are in for both closets now and one closet has bamboo q round and the other is half done. Just one stick short. Tape is pulled, contrary to the pick. The shoe holders are painted the same brown as the master bedroom. In the main room, the trim and doors are painted. The nail holes are painted over, though I might dab around again tomorrow. The wood filler is particularly dark.
Funny thing.. Christopher should find this particularly interesting. So, I’m putting in baseboard in the last closet. Remember, the shoe holders were built in and I just pulled the trim off the front. The hold trim went above the old vinyl tile, 1/8″ thick, and fit perfectly. I added a 1/8″ of vinyl tile and we laid the flooring on that. The we laid the flooring, which is 5/8″. I though I would have to router the baseboard down, but I didn’t. Amazingly, the new baseboard is 3/4″ shorter then the original and fit in front of the shoe holders w/o any modification. I put in the other one yesterday and didn’t event notice. That is so cool. No routering. Just nail it on.
To do.. Is pull the painters cloth over the whole room and get the spots on the ceiling I missed. Put down one more stick of q round in the closet and trim paint and fill all those nail holes. Some of the walls need a second coat of light green and the baseboard/wall needs a touch up dark green. It is very close. I’m to the point were I need a list, because it’s just little disjointed things here and there and I could forget one really easily.